March 31, 2009 The heavy lift ship Tern is moving tonight to an anchorage in Bedford Basin.
When she is in position, and all fitments have been secured, she will submerge her main deck.
Then, weather permitting, she will load HMCS Chicoutimi, and pump out her tanks to return to
seagoing draft. The damaged submarine will be transported to Esquimalt for permanent repairs.
Photo album created with Web Album Generator